General Information
Site: Ben-Gurion University of the Negev
Installation Year: May 2023
Status: Operational
Manufacturer: Gigabyte, Lenovo
Cluster CPU Cores: 2130
GPU’s: 48
Coda Cores: 93,440
RAM: 22.66 TB
VRAM: 2.817 TB
Processor: AMD EPYC 9654, AMD EPYC 7763, Intel Xeon Gold 5520, etc..
System Type: Dual HPC Cluster (CPU + GPU)
Scheduler: Run:AI (Kubernetes-based)
Storage: IBM ESS 3500 (parallel file system, GPFS)
Interconnect: InfiniBand (IB)
Operating System: Oracle Linux Server 9.4
Performance
Linpack Performance (Rmax): ~321 TFLOPS
Theoretical Peak (Rpeak): ~240 TFLOPS
Power Consumption
Power: ~32.5 kW
Power Measurement Level: 1




